Brake Replacement and Repair Service Case Studies


  The Datang Dabancheng Wind Farm is affiliated with Datang Urumqi Dabancheng Wind Power Development Co., Ltd. The wind farm has a total installed capacity of 48 MW and comprises 24 units of the Shanghai Electric W2000C-87-70 model. The yaw brakes on these units have been in operation for 10 years. Recently, a series of problems have emerged, including severe oil leakage from the brakes, oil soaking of the brake discs, scratches on the brake discs, significant wear of the friction pads, frequent activation of the hydraulic station, and repeated alarms from the hydraulic station indicating low hydraulic oil levels. As a result, the wind turbines have been experiencing abnormal noises and vibrations during yaw starts, stops, and while yawing. Due to insufficient braking force, the turbines exhibit slippage when parked in the yaw position, compromising the safety and stability of the units.

  In January 2025, based on a site survey conducted by energy technicians from the Economic Development Zone, it was decided to replace the yaw brakes of 24 wind turbines at the Dabancheng Wind Farm and to clean the yaw brake discs, removing the glaze layer that had formed on the disc surfaces. As of now, the newly installed KHQG-120 yaw brakes on the 24 wind turbines at the Dabancheng Wind Farm have not experienced any faults, such as abnormal yaw vibrations, unusual noises, or parking slip.

Keywords:

Brake Replacement and Repair Service Case Studies

Online Message


Please provide your phone and email information so we can resolve your issue as soon as possible.

Latest case


Brake Replacement and Repair Service Case Studies

The Datang Dabancheng Wind Farm is affiliated with Datang Urumqi Dabancheng Wind Power Development Co., Ltd. The wind farm has a total installed capacity of 48 MW and comprises 24 units of the Shanghai Electric W2000C-87-70 model.

view more

Yaw Gear Maintenance Service Case Studies

Thirty-three GW87/1500 wind turbine units manufactured by Xinjiang Goldwind Science & Technology Co., Ltd. have been installed at the Salt Lake Wind Farm. Each unit has a capacity of 1.5 megawatts, for a total installed capacity of 49.5 megawatts.

view more

Yaw Brake Rotor Repair Service Case

The Yandun Wind Farm, under the New Energy Branch of Huadian Xinjiang Power Generation Co., Ltd., is located in the southeastern part of Hami City, approximately 140 km from Hami’s urban area. It is situated within the wind corridor of the Yandun area, which is part of the second-phase project of the Hami Wind Power Base.

view more

Wind Turbine Yaw System Technical Upgrade Service Case

The Datang Shanxi Hongtiguan Wind Farm, which is equipped with 33 Huachuang 1500/93 wind turbines, went into operation in December 2014. Since commissioning, the turbines have consistently experienced abnormal noises and vibrations related to yaw motion, as well as oil leaks from the brakes. Since the wind farm began operations, the original manufacturer of the yaw brakes has been contacted multiple times to come to the site for troubleshooting. The original manufacturer has successively carried out several repairs, including replacing the yaw brake pads, sealing rings in the hydraulic cylinders, and adding an additional set of brakes; however, the issues have yet to be fully resolved.

view more