Wind Turbine Yaw System Technical Upgrade Service Case


  The Datang Shanxi Hongtiguan Wind Farm, which is equipped with 33 Huachuang 1500/93 wind turbines, went into operation in December 2014. Since commissioning, the turbines have consistently experienced abnormal noises and vibrations related to yaw motion, as well as oil leaks from the brakes. Since the wind farm began operations, the original manufacturer of the yaw brakes has been contacted multiple times to come to the site for troubleshooting. The original manufacturer has successively carried out several repairs, including replacing the yaw brake pads, sealing rings in the oil cylinders, and adding an additional set of brakes; however, the issues have yet to be fully resolved.

  Based on the actual conditions of the on-site units, Kaifeng Energy conducted a detailed analysis and assessment, and carried out the retrofitting of 33 wind turbines in two phases. The original six 90-brake units were upgraded to seven newly developed 105-type yaw brakes designed by the company. Additionally, the damaged brake discs were milled and repaired. Phase I, involving 17 turbines, was completed in July 2020. To date, not a single turbine has experienced yaw vibration, abnormal noises, or oil leaks. Phase II, covering the remaining 16 turbines, was also completed in May 2024.

Keywords:

Wind Turbine Yaw System Technical Upgrade Service Case

Online Message


Please provide your phone and email information so we can resolve your issue as soon as possible.

Latest case


Brake Replacement and Repair Service Case Studies

The Datang Dabancheng Wind Farm is affiliated with Datang Urumqi Dabancheng Wind Power Development Co., Ltd. The wind farm has a total installed capacity of 48 MW and comprises 24 units of the Shanghai Electric W2000C-87-70 model.

view more

Yaw Gear Maintenance Service Case Studies

Thirty-three GW87/1500 wind turbine units manufactured by Xinjiang Goldwind Science & Technology Co., Ltd. have been installed at the Salt Lake Wind Farm. Each unit has a capacity of 1.5 megawatts, for a total installed capacity of 49.5 megawatts.

view more

Yaw Brake Rotor Repair Service Case

The Yandun Wind Farm, under the New Energy Branch of Huadian Xinjiang Power Generation Co., Ltd., is located in the southeastern part of Hami City, approximately 140 km from Hami’s urban area. It is situated within the wind corridor of the Yandun area, which is part of the second-phase project of the Hami Wind Power Base.

view more

Wind Turbine Yaw System Technical Upgrade Service Case

The Datang Shanxi Hongtiguan Wind Farm, which is equipped with 33 Huachuang 1500/93 wind turbines, went into operation in December 2014. Since commissioning, the turbines have consistently experienced abnormal noises and vibrations related to yaw motion, as well as oil leaks from the brakes. Since the wind farm began operations, the original manufacturer of the yaw brakes has been contacted multiple times to come to the site for troubleshooting. The original manufacturer has successively carried out several repairs, including replacing the yaw brake pads, sealing rings in the hydraulic cylinders, and adding an additional set of brakes; however, the issues have yet to be fully resolved.

view more