Service Case for Wind Farm Unit Hydraulic and Water-Cooling System Maintenance Projects


  The Huitengxile wind farm project was launched in 1996. As of 2021, it has installed a total of 94 wind turbine units, boasting a wind power density of 662 watts per square meter and an average annual effective wind duration of 6,255 hours. In December 2007, CSSC Heavy Industry, a subsidiary of China Shipbuilding Industry Corporation, installed the first domestically produced 2 MW wind turbine at the Huitengxile Wind Farm, setting new national records at the time for single-unit capacity, rotor diameter, and tower height. In 2023, hydraulic system defects—including low pressure, operational imbalance, abnormal operating temperatures, and unusual internal noises—were reported in the hydraulic stations of 21 wind turbines (model HZ2.OMW2.OMW) at the Huitengxile Wind Farm. The Huitengxile Wind Farm is located within Chahar Right Middle Banner, Ulanqab City, Inner Mongolia. Its elevation ranges from 2,000 to 1,031 meters above sea level, and the region experiences winter temperatures as low as minus 40 degrees Celsius.

  In August of that year, Kaihua Energy signed a technical agreement with the Huitengxile Wind Farm to provide maintenance services for the hydraulic and water-cooling systems of the project’s 21 wind turbine units. As of now, the hydraulic systems and water-cooling circulation systems of the HZ 2.0 MW units that have been serviced are still operating normally without any reported malfunctions.

Keywords:

Service Case for Wind Farm Unit Hydraulic and Water-Cooling System Maintenance Projects

Online Message


Please provide your phone and email information so we can resolve your issue as soon as possible.

Latest case


Brake Replacement and Repair Service Case Studies

The Datang Dabancheng Wind Farm is affiliated with Datang Urumqi Dabancheng Wind Power Development Co., Ltd. The wind farm has a total installed capacity of 48 MW and comprises 24 units of the Shanghai Electric W2000C-87-70 model.

view more

Yaw Gear Maintenance Service Case Studies

Thirty-three GW87/1500 wind turbine units manufactured by Xinjiang Goldwind Science & Technology Co., Ltd. have been installed at the Salt Lake Wind Farm. Each unit has a capacity of 1.5 megawatts, for a total installed capacity of 49.5 megawatts.

view more

Yaw Brake Rotor Repair Service Case

The Yandun Wind Farm, under the New Energy Branch of Huadian Xinjiang Power Generation Co., Ltd., is located in the southeastern part of Hami City, approximately 140 km from Hami’s urban area. It is situated within the wind corridor of the Yandun area, which is part of the second-phase project of the Hami Wind Power Base.

view more

Wind Turbine Yaw System Technical Upgrade Service Case

The Datang Shanxi Hongtiguan Wind Farm, which is equipped with 33 Huachuang 1500/93 wind turbines, went into operation in December 2014. Since commissioning, the turbines have consistently experienced abnormal noises and vibrations related to yaw motion, as well as oil leaks from the brakes. Since the wind farm began operations, the original manufacturer of the yaw brakes has been contacted multiple times to come to the site for troubleshooting. The original manufacturer has successively carried out several repairs, including replacing the yaw brake pads, sealing rings in the hydraulic cylinders, and adding an additional set of brakes; however, the issues have yet to be fully resolved.

view more